Our Projects
We are the trusted choice for West Africa’s leading electrical utilities and the world’s largest Engineering, Procurement, and Construction (EPC) companies when it comes to critical projects. Our focus is on the construction and installation of electrical grids throughout West Africa.
With a proven track record of excellence, our experienced teams have successfully completed projects involving high-voltage (HV), medium-voltage (MV), and low-voltage (LV) power lines and substations. Our specialization lies in the seamless installation and commissioning of power transformers, ensuring the establishment of efficient and reliable electrical infrastructure.
Explore our project portfolio to witness our unwavering commitment to delivering exceptional results. By contributing to the advancement of West Africa’s power sector, we are proud to play a significant role in powering the progress of the continent.
HT/LT & DISTRIBUTION
100 MV – LV Transformer
Tamba & Ziguinchor 225 kV HV Line
225/30 kV Substation Installation
200+ kms LV/HV Lines
RESIDENTIAL ELECTRIC WORKS
Successfully Energized 5 Residential Buildings (80 Apartments) Wiring and Grid Connection for 6 Residential Buildings (130 apartments)
SOLAR INSTALLATION WORKS
Complete Solar Mini Grid Installations Secondary Distribution Systems Solar On/Off Grid System Battery Backup Hybrid Systems
ENGINEERING SERVICES
Successfully Connecting and Wiring 37,500+ Households to the Grid
Implementing Overhead Primary Distribution Systems Establishing Secondary Distribution Networks in Five Villages
Foundation
ELECTRICAL INSTALLATION
Underground Primary Distribution: 30 kV Feeders Out of Tambacounda, Kolda and Ziguinchor Substations Underground Primary Distribution, RMU Panels 30,000/400V transformer + Secondary Distribution
OPERATION & MAINTENANCE
Replacing Damaged Poles Restructuring the Grid in Specific Areas to Enhance Power Quality and Reliability Installing Replacement or Additional Distribution Substations with Transformers